{"id":43507,"date":"2017-08-17T16:05:31","date_gmt":"2017-08-17T23:05:31","guid":{"rendered":"http:\/\/69.46.6.243\/?p=43507"},"modified":"2017-08-17T16:05:31","modified_gmt":"2017-08-17T23:05:31","slug":"california-transportation-commission-authorizes-nearly-690-million-to-accelerate-additional-transportation-projects","status":"publish","type":"post","link":"https:\/\/new.thepinetree.net\/?p=43507","title":{"rendered":"California Transportation Commission Authorizes Nearly $690 Million to Accelerate Additional Transportation Projects"},"content":{"rendered":"<p>Sacramento, CA&#8230;Caltrans today announced that 32 major \u201cfix-it-first\u201d transportation projects can be accelerated a year earlier than planned thanks to anticipated funding from Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017. The advancement is possible due to nearly $690 million in funding authorized today by the California Transportation Commission (CTC).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans-300x231.gif\" alt=\"\" width=\"300\" height=\"231\" class=\"alignnone size-medium wp-image-43508\" srcset=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans-300x231.gif 300w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans-570x439.gif 570w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans-150x116.gif 150w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans-500x385.gif 500w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>\u201cThe needs in California are great and we are not waiting for the funding to come in. The time to get to work is now and we are lining up the projects,\u201d said Caltrans Director Malcolm Dougherty. \u201cSB 1 is a game changing investment for transportation in California, and Caltrans is already putting that money to work across the state.\u201d<\/p>\n<p>The 32 projects are part of a list Caltrans submitted to the California Transportation Commission (Commission) that was approved at the Commission\u2019s August meeting. These projects will fix pavement on highways across the state, fix and replace deficient bridges and install traffic management systems that help manage traffic and reduce congestion. See the attached list for project details.<\/p>\n<p>The projects authorized today come on the heels of more than $285 million in accelerated existing highway repair projects announced earlier in July.<\/p>\n<p>SB 1 provides an ongoing funding increase of approximately $1.8 billion annually for the maintenance and rehabilitation of the state highway system, including $400 million specifically for bridges and culverts. SB 1 funds will enable Caltrans to fix more than 17,000 lane miles of pavement, 500 bridges and 55,000 culverts by 2027. Caltrans will also fix 7,700 traffic operating systems, like ramp meters, traffic cameras and electric highway message boards that help reduce highway congestion. When this work is finished, 98 percent of pavement on state facilities will be in good or fair condition, up from 85 percent today.<\/p>\n<p>Caltrans is committed to conducting its business in a fully transparent manner and detailing its progress to the public. For complete details on SB 1, visit http:\/\/www.rebuildingca.ca.gov\/.<\/p>\n<table border=\"0\" cellspacing=\"0\">\n<colgroup width=\"119\"><\/colgroup>\n<colgroup width=\"87\"><\/colgroup>\n<colgroup width=\"69\"><\/colgroup>\n<colgroup width=\"65\"><\/colgroup>\n<colgroup width=\"401\"><\/colgroup>\n<colgroup width=\"159\"><\/colgroup>\n<colgroup width=\"125\"><\/colgroup>\n<tbody>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"101\"><b><span style=\"color: #000000;\">County<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\">Route<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\">Begin Postmile<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\">End Postmile<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\">Project Description<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\">CTC Authorizes<\/span><\/b><\/td>\n<td align=\"center\" valign=\"middle\"><b><span style=\"color: #000000;\"> Total Project Cost <\/span><\/b><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"81\"><span style=\"color: #000000;\">Humboldt<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">101<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R39.2<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R48.3<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$17.4 million pavement preservation project will improve 36.8 lane miles of U.S. Highway 101 from Englewood Park Undercrossing to Eel River Bridge near Redcrest in Humboldt County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$17,383,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $17,383,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">Mendocino<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">0.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">15.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$16.6 million pavement preservation project will improve 31.4 lane miles of State Route 1 from the Mendocino\/ Sonoma County line to south of Mill Street in the city of Point Arena in Mendocino County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$16,602,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $16,602,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Mendocino<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">101<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R0.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R9.6<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$16 million pavement preservation project will improve 36.1 lane miles of U.S. Highway 101 from south of Geysers Road to Hopland Overhead Bridge near Hopland.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$16,015,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $16,015,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Mendocino<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">62.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">78.9<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$15.1 million pavement preservation project will improve 32.9 lane miles of State Route 1 from Pudding Creek Bridge to north of Wages Creek Bridge near the city of Fort Bragg.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$15,113,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $15,113,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"61\"><span style=\"color: #000000;\">Humboldt<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">101<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R90.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">109.6<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$50.6 million pavement preservation project will improve 77.7 lane miles of U.S. Highway 101 from south of School Road to north of Big Lagoon Bridge near the city of Trinidad.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$332,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $50,631,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">Siskiyou<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">2.5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">3.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$22.6 million project will replace the southbound bridge deck on Interstate 5 from Central Dunsmuir Undercrossing to north of Siskiyou Avenue Overcrossing at Sacramento River Bridge in Siskiyou County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$1,440,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $22,649,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Trinity<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">299<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1.6<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">45.2<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$8.9 million project will fix 18 culverts along State Route 299 at various locations from west of White House Gulch Road to west of Slattery Pond Road in Trinity County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$930,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $8,931,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Sacramento<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">50<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">L0.6<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R5.3<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$278.3 million pavement preservation project will improve 56 lane miles on U.S. Highway 50 from Interstate 5 to Watt Avenue Overcrossing in the city of Sacramento.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$278,300,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $278,300,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"100\"><span style=\"color: #000000;\">Sacramento<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">99 &amp; 51<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">10.0 &amp; 0.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R24.3 &amp; 0.1<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$12.2 million traffic management systems project will install 14 miles of fiber optic cable along State Route 99 from Grant Line Road to U.S. Highway 50\/State Route 51 Jct., and on SR-51 from US-50 to south of the Fort Sutter Viaduct in Sacramento County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$12,150,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $12,150,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Sutter<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">99<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">39.4<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">41.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$20 million pavement preservation project will improve 4.8 lane miles on State Route 99 from north of Coleman Avenue to north of Ramsdell Drive in Live Oak.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$20,050,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $20,050,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"64\"><span style=\"color: #000000;\">Sacramento<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">80<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">M9.6<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">12.9<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$18.2 million pavement preservation project will improve 35.6 lane miles on Interstate 80 from east of Longview Drive to east of Madison Avenue near the city of Sacramento.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$50,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $18,230,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"100\"><span style=\"color: #000000;\">Butte<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">99<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">28.3<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">T37.8<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$11.6 million traffic management systems project will install 9.4 miles of cable for Intelligent Transportation System elements that communicate to travelers with transportation information on State Route 99 from Estates Drive to Garner Lane near Chico.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$561,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $11,636,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"98\"><span style=\"color: #000000;\">Alameda<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">680<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">M0.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R21.9<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$4 million traffic management systems project will install ramp meters, ramp carpool bypass lanes and traffic operations systems along Interstate 680 from Scott Creek Road to Alcosta Boulevard near the cities of Fremont, Pleasanton and Dublin.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$40,400,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $40,400,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"40\"><span style=\"color: #000000;\">Alameda<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">580<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R35.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R35.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$991 thousand project will revamp the bridge deck at Foothill Boulevard Undercrossing in the city of Oakland.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$991,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $991,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">Santa Cruz<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">31.9<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">35.7<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$8.3 million will replace and upgrade four existing culverts with reinforced concrete pipe along State Route 1 from north of Swanton Road to south of Waddell Creek near Davenport in Santa Cruz County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$964,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $8,267,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"100\"><span style=\"color: #000000;\">Santa Barbara<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">135<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">11.7<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">17.8<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$20.8 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 24.4 lane miles on State Route 135 from Lakeview Road to U.S. Highway 101 Junction near the city of Santa Maria.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$1,869,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $20,847,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"104\"><span style=\"color: #000000;\">San Luis Obispo<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">10.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">16.8<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$15 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 13.5 lane miles on State Route 1 from Garcia Way to North Pismo (U.S. Highway 101\/SR-1) Separation near the city of Pismo Beach.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$1,156,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $15,066,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">Monterey<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">68<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">L4.3<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$12.2 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 6.5 lane miles on State Route 68 from Forest Avenue to SR-1 Junction near the city of Pacific Grove.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$482,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $12,173,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"100\"><span style=\"color: #000000;\">Santa Barbara<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">246 &amp; 1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">8.3 &amp; 19.3<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">9.5 &amp; 20.6<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$15 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 9 lane miles on State Route 246 from west of V Street to H Street, and SR-1 from H Street to 12th Street in Santa Barbara County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">3,630,000<\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $15,090,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"40\"><span style=\"color: #000000;\">Monterey<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">63.0<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">63.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$11.8 million project will revamp the Garrapata Creek Bridge near Carmel-by-the-Sea in Monterey County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$700,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $11,790,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"110\"><span style=\"color: #000000;\">Madera<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">99<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">13.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">19.6<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$13.8 million pavement preservation project will improve 26 lane miles on State Route 99 from north of Avenue 16 Overcrossing to north of Avenue 20 Overcrossing near the city of Madera in Madera County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$13,753,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $13,753,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"122\"><span style=\"color: #000000;\">Fresno<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">99<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R5.7<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">11.1<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$99.9 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 32.4 lane miles on State Route 99 from Rose Avenue Undercrossing to Merced Street Undercrossing near Selma and Fowler in Fresno County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$99,925,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $99,925,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"102\"><span style=\"color: #000000;\">Los Angeles<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">110 &amp; Various<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R0.7 &amp; Various<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">8.8 &amp; Various<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$1.9 million traffic management systems project will install 76 wireless Bluetooth\u2122 detection systems to monitor travel time on Interstate 110 from Gaffey Street to I-405, and on Interstates 210, 405, 605, 710 and State Route 2 at various locations within Los Angeles County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$40,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $1,923,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"40\"><span style=\"color: #000000;\">Calaveras<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">16.1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">16.1<\/span><\/td>\n<td align=\"left\" valign=\"middle\">$5.6 million project will replace the West Branch Cherokee Creek Bridge near the city of Angels Camp.<\/td>\n<td align=\"left\" valign=\"middle\">$605,000<\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $5,619,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">Tuolumne<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">108<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R18.9<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">38.8<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$22 million pavement preservation project will improve 51.6 lane miles on State Route 108 from Long Barn Road to Cow Creek Road near Long Barn in Tuolumne County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$687,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $21,997,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"60\"><span style=\"color: #000000;\">San Joaquin<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">26.5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">26.5<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$8.1 million project will replace sections of pavement on the bridge deck at the Stockton Channel Viaduct in San Joaquin County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$8,096,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $8,096,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">San Joaquin<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">4<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R15.5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R16.6<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$38.1 million pavement preservation project will improve 9.5 lane miles on State Route 4 from east of Fresno Avenue to the Crosstown Freeway Viaduct in the city of Stockton.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$38,094,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $38,094,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">Mariposa<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">49<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">0.3<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">18.5<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$19.8 million pavement preservation project will improve 34.6 lane miles on State Route 49 from the Mariposa\/Madera County line to State Route 140 Junction near Mariposa.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$19,798,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $19,798,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"100\"><span style=\"color: #000000;\">San Diego<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R19.5<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R55.4<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$24.2 million traffic management systems project will install Changeable Message Signs, ramp metering, traffic signal, loop detectors, fiber optic network elements, etc. on Interstate 5 from the city of San Diego to the city of Oceanside.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$24,238,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $24,238,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"80\"><span style=\"color: #000000;\">San Diego<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">8<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">L0.7<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">R23.0<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$13.2 million project will repair, replace and restore culverts along Interstate 8 from west of Midway Drive Undercrossing to west of Flinn Springs Road Undercrossing in San Diego County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$13,230,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $13,230,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"128\"><span style=\"color: #000000;\">Orange<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">5 &amp; Various<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">33.0 &amp; Various<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">43.2 &amp; Various<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$23.7 million traffic management systems project will install 311 field elements, including upgrading Intelligent Transportation System elements, on Interstate 5, State Route 57 and State Route 91 at various locations within Orange County.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$23,673,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $23,673,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" height=\"104\"><span style=\"color: #000000;\">ORA<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">1<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">4.7<\/span><\/td>\n<td align=\"center\" valign=\"middle\"><span style=\"color: #000000;\">14.1<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$18.4 million pavement preservation project will upgrade Americans with Disabilities Act (ADA) curb ramps and improve 36 lane miles on State Route 1 from south of Vista Del Sol to Newport Coast Drive in the cities of Laguna Beach and Newport Beach.<\/span><\/td>\n<td align=\"left\" valign=\"middle\"><span style=\"color: #000000;\">$18,375,000 <\/span><\/td>\n<td align=\"right\" valign=\"middle\"><span style=\"color: #000000;\"> $18,375,000 <\/span><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"bottom\" height=\"20\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td align=\"center\" valign=\"bottom\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td align=\"center\" valign=\"bottom\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td align=\"center\" valign=\"bottom\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td align=\"left\" valign=\"bottom\"><span style=\"color: #000000;\">\u00a0<\/span><\/td>\n<td align=\"right\" valign=\"bottom\"><span style=\"color: #000000;\">$689,632,000 <\/span><\/td>\n<td align=\"right\" valign=\"bottom\"><b><span style=\"color: #000000;\"> $901,035,000 <\/span><\/b><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>Sacramento, CA&#8230;Caltrans today announced that 32 major \u201cfix-it-first\u201d transportation projects can be accelerated a year earlier than planned thanks to anticipated funding from Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017. The advancement is possible due to nearly $690 million in funding authorized today by the California Transportation Commission (CTC). [&hellip;]<\/p>\n","protected":false},"author":1599,"featured_media":43508,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_cbd_carousel_blocks":"[]","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[20,5,1,13],"tags":[],"class_list":["post-43507","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-government","category-news","category-traffic-fire","last_archivepost"],"jetpack_featured_media_url":"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2017\/08\/ct_logo_trans.gif","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/43507","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/users\/1599"}],"replies":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=43507"}],"version-history":[{"count":0,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/43507\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/media\/43508"}],"wp:attachment":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=43507"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=43507"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=43507"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}