{"id":61755,"date":"2018-06-22T07:29:26","date_gmt":"2018-06-22T14:29:26","guid":{"rendered":"http:\/\/69.46.6.243\/?p=61755"},"modified":"2018-06-22T07:29:26","modified_gmt":"2018-06-22T14:29:26","slug":"paving-continues-on-hwy-108-hwy-120-in-stanislaus-tuolumne-counties","status":"publish","type":"post","link":"https:\/\/new.thepinetree.net\/?p=61755","title":{"rendered":"Paving Continues on Hwy 108 &#038; Hwy 120 in Stanislaus &#038; Tuolumne Counties"},"content":{"rendered":"<p>Stanislaus\/Tuolumne County \u2013 The California Department of Transportation (Caltrans) is performing a highway improvement project that will repave 34 miles of State Route 108\/(SR-108) and SR-120 in Stanislaus and Tuolumne counties.  The project began at Lancaster Road in eastern Stanislaus County and will continue to the SR-49\/SR-108 junction in Tuolumne County, as well as to Moccasin Creek Bridge on SR-120 in southern Tuolumne County. This project will extend the service life of the existing pavement and improve efficiency and safety for motorists on these highways. <\/p>\n<p><a href=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120.jpg\" alt=\"\" width=\"640\" height=\"288\" class=\"alignnone size-full wp-image-61756\" srcset=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120.jpg 640w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120-300x135.jpg 300w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120-570x257.jpg 570w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p>This $20.3 million project is being performed by George Reed Inc. of Modesto.  Work began Monday, April 2, 2018, with the project expected to finish in October 2018.<\/p>\n<p>Night work will typically be from 7:00 p.m. until 5:00 a.m., with day work usually from 6:00 a.m. to 6:00 p.m. Friday\u2019s work will typically end at 3:00 p.m.<\/p>\n<p>Motorists can expect lane closures and one-way traffic control, with flaggers handling the traffic flow, and 10-minute delays during the project. Please leave extra time to reach your destination, and be aware of vehicles and workers adjacent to the roadway.<\/p>\n<p>While this project is not funded by SB 1, many pavement-based \u201cfix-it-first\u201d projects are and will continue to be across the next decade. Due to SB 1, Caltrans will allocate $15 billion for \u201cfix-it-first\u201d repairs, similar to the smoothing of pavement on SR-108\/120, throughout the next 10 years.<br \/>\nWork is scheduled to begin as listed, but is subject to change due to traffic incidents, weather, availability of equipment and\/or materials and construction related issues.<\/p>\n<p>#<br \/>\nFor the safety of workers and other motorists, please Slow For the Cone Zone.<br \/>\n##<br \/>\nwww.dot.ca.gov<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stanislaus\/Tuolumne County \u2013 The California Department of Transportation (Caltrans) is performing a highway improvement project that will repave 34 miles of State Route 108\/(SR-108) and SR-120 in Stanislaus and Tuolumne counties. The project began at Lancaster Road in eastern Stanislaus County and will continue to the SR-49\/SR-108 junction in Tuolumne County, as well as to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":61756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_cbd_carousel_blocks":"[]","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[20,1,13,27],"tags":[],"class_list":["post-61755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-news","category-traffic-fire","category-tuolumne-county","last_archivepost"],"jetpack_featured_media_url":"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2018\/06\/pav120.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/61755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=61755"}],"version-history":[{"count":0,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/61755\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/media\/61756"}],"wp:attachment":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=61755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=61755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=61755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}