{"id":80911,"date":"2019-05-28T22:31:53","date_gmt":"2019-05-29T05:31:53","guid":{"rendered":"http:\/\/69.46.6.243\/?p=80911"},"modified":"2019-05-28T22:31:53","modified_gmt":"2019-05-29T05:31:53","slug":"caltrans-to-begin-731000-sb-1-culvert-replacement-project-on-state-route-108-in-tuolumne-county","status":"publish","type":"post","link":"https:\/\/new.thepinetree.net\/?p=80911","title":{"rendered":"Caltrans to Begin $731,000 SB 1 Culvert Replacement Project  on State Route 108 in Tuolumne County"},"content":{"rendered":"<p>Tuolumne County, CA&#8230;Drainage Project to Provide Safer, More Comfortable Ride for Tourists, Residents and Big Rigs. Next week, Caltrans will begin work to replace four culverts on rural State Route 108 in the Sierra Nevada. The $731,000 project is funded through Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017. The six-month project will replace a culvert near Donnell Lake and three others by the Tuolumne\/Mono County line. The work will improve Caltrans\u2019 ability to safely and efficiently transport water and debris away from the highway to minimize flooding and provide more comfortable trips for travelers. \u201cHighway 108 is a popular route for spring and summer travelers who want to explore the mountains,\u201d said Caltrans Director Laurie Berman. \u201cBy supporting tourism, we strengthen California\u2019s economy as well as the quality of life in many small towns and communities.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-80912\" src=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert2.jpg\" alt=\"\" width=\"640\" height=\"423\" srcset=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert2.jpg 579w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert2-300x198.jpg 300w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert2-570x377.jpg 570w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-80913\" src=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert.jpg\" alt=\"\" width=\"640\" height=\"478\" srcset=\"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert.jpg 347w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert-300x224.jpg 300w, https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert-119x89.jpg 119w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p>Approximately 3,100 motorists travel this stretch of SR-108 daily, including nearly 100 commercial trucks carrying lumber, produce, cattle and other supplies between communities such as Sonora Junction, Dardanelle, and Strawberry. \u201cRoute 108 is transporting travelers to some of the state\u2019s most beautiful scenery, as well as a<br \/>\nnumber of activities including camping, hiking, cycling and more,\u201d Caltrans District 10 Director Dan McElhinney said. \u201cCaltrans encourages an active and healthy lifestyle, and these mountain highways provide access. You\u2019ll see plenty of cyclists using these highways, and those cyclists and other tourists contribute to the local economy, so please share the road for safety.\u201d<\/p>\n<p>Work is scheduled to begin the week of June 3, 2019, and the project is expected to finish in December 2019. Work will primarily be done Monday through Thursday from 6 a.m. to 6 p.m., with Friday\u2019s shift ending at 3:00 p.m. so the road is clear for weekend visitors.<\/p>\n<p>Motorists should expect delays of 10 to 15 minutes during construction and are encouraged to plan their trips accordingly. Be Work Zone Alert while driving through construction zones. The work schedule is subject to change due to traffic incidents, weather, availability of equipment and materials, or construction-related issues. More information and updates on projects can be found at http:\/\/www.dot.ca.gov\/d10\/projects.html or on Twitter via @CaltransDist10.<\/p>\n<p>SB 1 provides an ongoing funding increase of approximately $1.8 billion annually for the maintenance and rehabilitation of the state highway system. SB 1 funds will enable Caltrans to fix more than 17,000 lane miles of pavement, 500 bridges and 55,000 culverts by 2027.<\/p>\n<p>Caltrans is committed to conducting its business in a fully transparent manner and detailing its progress to the public. For complete details on SB 1, visit http:\/\/www.rebuildingca.ca.gov\/.<\/p>\n<p>###<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tuolumne County, CA&#8230;Drainage Project to Provide Safer, More Comfortable Ride for Tourists, Residents and Big Rigs. Next week, Caltrans will begin work to replace four culverts on rural State Route 108 in the Sierra Nevada. The $731,000 project is funded through Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017. The [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":80912,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_cbd_carousel_blocks":"[]","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[20,1,13,27],"tags":[],"class_list":["post-80911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-news","category-traffic-fire","category-tuolumne-county","last_archivepost"],"jetpack_featured_media_url":"https:\/\/new.thepinetree.net\/wp-content\/uploads\/2019\/05\/108culvert2.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/80911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=80911"}],"version-history":[{"count":0,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/posts\/80911\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=\/wp\/v2\/media\/80912"}],"wp:attachment":[{"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=80911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=80911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new.thepinetree.net\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=80911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}