Angels Camp, CA…The latest schedule of road repairs and maintenance that will affect your travels in our area and as you travel. Locally crews will be working on many of our roadways. Below is Caltrans plans for repairs and maintenance on local roads. It shows the route, county and location of the possible repairs. Weather and other factors can alter their schedule.
Rte | County | Date From |
Date To |
Time In |
Time Out |
Dir | Location / Additional Information |
Estimated Delay |
49 | TUO MPA |
03/22/18 | 05/01/18 | 13:15 | 18:01 | NB/SB | Begin: Moccasin Creek End: Bear Valley Road Restriction: Full highway closure (Long Term) Reason: Roadway wash-out/slip-out |
1hr |
49 | TUO | 03/28/18 | 03/30/18 | 8:30 | 15:30 | NB/SB | Begin: State Route 120, North/Chinese Camp End: New Melones Reservoir Restriction: Moving closure – #2, #1 of 2 lanes, right turn lane, left turn lane, two-way left turn lane, right shoulder Reason: Sweeping Operation |
10 mins |
59 | MER | 03/22/18 | 05/01/18 | 23:01 | 17:01 | NB/SB | Begin: Reilly Road End: Sandy Mush Road Restriction: Long-term full highway closure Reason: Roadway wash-out/slip-out |
15 mins |
99 | SJ | 03/28/18 | 03/28/18 | 8:30 | 16:01 | NB | Begin: State Route 120/Yosemite Avenue End: Arch Road Under-Crossing Restriction: Intermittent #4 of 3 lanes, right shoulder, auxiliary lane Reason: Sweeping Operation |
10 mins |
108 | STA | 03/27/18 | 03/30/18 | 8:30 | 15:01 | EB/WB | Begin: Adams/Snedigar Road End: Willowood Drive Restriction: #2, #1 of 2 lanes, median, right shoulder (alternately) Reason: Crack Seal Operation |
10 mins |
108 | TUO | 03/27/18 | 03/28/18 | 8:30 | 15:30 | EB/WB | Begin: State Route 120 Yosemite Junction End: Hidden Acres Road Restriction: Moving closure – #1, #2 of 2 lanes, left turn lane, left shoulder, right turn lane, two-way left turn lane, right shoulder Reason: Sweeping Operation |
10 mins |
132 | MPA | 03/22/18 | 05/01/18 | 13:30 | 18:01 | EB/WB | Begin: Granite Springs Road End: Piney Creek Road Restriction: Full highway closure(Long term) Reason: Roadway wash-out/slip-out |
15 mins |
132 | STA | 03/26/18 | 05/01/18 | 8:01 | 14:01 | EB/WB | Begin: Lake Road End: South Old La Grange Road Restriction: One-way traffic control Reason: Roadway wash-out/slip-out |
10 mins |
132 | TUO MPA |
03/27/18 | 03/30/18 | 7:30 | 21:01 | EB/WB | Begin: Bonds Flat Road End: Granite Springs Road Restriction: One-way traffic control Reason: Roadway wash-out/slip-out |
10 mins |
140 | MPA | 03/26/18 | 05/01/18 | 8:15 | 18:01 | EB/WB | Begin: Miles Creek Bridge End: Miles Creek Bridge Restriction: One-way traffic control Reason: Roadway wash-out/slip-out |
10 mins |
140 | MPA | 03/26/18 | 05/01/18 | 8:45 | 18:30 | EB/WB | Begin: Miles Creek Bridge End: Miles Creek Bridge Restriction: One-way traffic control Reason: Roadway wash-out/slip-out |
10 mins |
165 | MER | 03/28/18 | 03/28/18 | 7:01 | 15:30 | NB | Begin: Overlan Drive End: Overlan Drive Restriction: Right shoulder Reason: Shoulder Work |
5 mins |
Rte | County | Begin PM |
End PM |
Time In |
Time Out |
Dir | Location / Additional Information |
Estimated Delay |
4 | CAL | 2.9 | 4.8 | 9:01 | 15:01 | EB/WB | Begin: Shirley Road End: McCarty Creek Restriction: Right shoulder, left shoulder Reason: Guardrail Repair |
10 mins |
4 | SJ | 14.6 | 19.4 | 8:30 | 15:01 | WB | Begin: Navy Drive/Crosstown Freeway End: State Route 99/Crosstown Freeway Restriction: Intermittent #3 of 3 lanes, right shoulder Reason: Sweeping Operation |
10 mins |
4 | SJ | 15.8 | 15.8 | 21:01 | 5:01 | EB/WB | Begin: Navy Drive End: Navy Drive Restriction: #2 of 2 lanes, right shoulder Reason: Traffic Signal Work |
10 mins |
4 | SJ | 15.8 | 15.8 | 6:01 | 17:01 | EB/WB | Begin: Navy Drive End: Navy Drive Restriction: Right shoulder, left shoulder Reason: Traffic Signal Work |
5 mins |
4 | SJ | 18.8 | 14.7 | 8:30 | 15:01 | EB | Begin: Filbert Street End: Tillie Lewis Road Restriction: Intermittent #3 of 3 lanes, right shoulder Reason: Sweeping Operation |
10 mins |
5 | SJ | 25.2 | 25.2 | 22:01 | 5:01 | NB | Begin: Charter Way End: Charter Way Restriction: Partial off- and on-ramp closure (#1 of 2 lanes, right shoulder) Reason: Traffic Signal Work |
10 mins |
5 | SJ | 16.5 | 35.3 | 9:01 | 14:01 | NB/SB | Begin: Louise Avenue End: Eight Mile Road Restriction: Right shoulder Reason: Core Drilling |
5 mins |
12 | SJ | 17.1 | 17.7 | 6:01 | 19:01 | EB/WB | Begin: School Street End: Central Avenue Restriction: Bike lane, left shoulder, right shoulder, sidewalk Reason: Curb/Gutter/Sidewalk Work |
5 mins |
49 | AMA | 4.2 | 4.9 | 18:01 | 6:01 | NB/SB | Begin: North Fork Jackson Creek End: Beacon Gas Station Restriction: #2, #1 of 4 lanes Reason: Drainage Work |
10 mins |
49 | CAL | 8.1 | 8.3 | 7:01 | 21:01 | NB/SB | Begin: Stanislaus Avenue End: Murphys Grade Road Restriction: Intermittent one-way traffic control Reason: K-rail Installation |
10 mins |
49 | CAL | 8.3 | 8.7 | 7:01 | 18:01 | NB | Begin: Murphys Grade Road End: NB State Route 4 Restriction: Right shoulder Reason: Utility Work |
5 mins |
49 | CAL | 19.4 | 19.5 | 8:01 | 17:01 | NB/SB | Begin: Gatewood Street End: Adam Street (Left) Restriction: Intermittent one-way traffic control Reason: Pavement Repair |
10 mins |
49 | MPA | 30.7 | 34.8 | 8:01 | 14:01 | NB/SB | Begin: Vista Point End: Bagby Vista Point Restriction: Left shoulder, right shoulder Reason: Sign Work |
5 mins |
49 | MPA | 34 | 34 | 7:01 | 17:01 | NB/SB | Begin: Merced River Bridge End: Merced River Bridge Restriction: One-way traffic control Reason: Shoulder Work |
10 mins |
49 | TUO | 0 | 3 | 8:01 | 14:01 | NB/SB | Begin: Cattle Guard Road End: Jackass Gulch Bridge Restriction: Left shoulder, right turn lane Reason: Drainage Work |
5 mins |
99 | MER | 7.4 | 11.3 | 7:01 | 15:30 | SB | Begin: Legrand Road End: Healy Road Restriction: #3 of 3 lanes Reason: Crack Seal Operation |
10 mins |
99 | MER | 21.6 | 23.5 | 9:01 | 15:01 | NB | Begin: East Atwater Overhead End: West Atwater Overhead Restriction: Right shoulder Reason: Tree Work |
5 mins |
99 | MER STA |
35.9 | 0.2 | 21:01 | 5:59 | NB/SB | Begin: Bradbury Road End: Turlock Rest Area Restriction: #3, #2, #1 of 3 lanes, right shoulder, left shoulder Reason: K-Rrail and Striping Operations |
10 mins |
99 | SJ | 13.5 | 15 | 20:01 | 6:01 | NB | Begin: Frontage Road East End: Arch Road Restriction: #3 of 3 lanes Reason: Highway Construction |
10 mins |
99 | SJ | 14.6 | 14.6 | 21:01 | 5:01 | NB/SB | Begin: Arch Road End: Arch Road Restriction: Full off- and on-ramp closures Reason: ITS/Various Electrical Works |
10 mins |
99 | SJ | 15 | 14 | 20:01 | 6:01 | SB | Begin: Arch Road End: Frontage Road East Restriction: #3 of 3 lanes Reason: Highway Construction |
10 mins |
99 | SJ | 18.5 | 22.9 | 20:01 | 6:01 | NB/SB | Begin: Marsh Street Pedestrian Overcrossing (South of Remont Street) End: Hammer Lane Over-Crossing Restriction: #3, #4, #1, #2 of 4 lanes (alternately) Reason: Pavement Work |
10 mins |
99 | SJ | 32.6 | 33.6 | 9:01 | 14:01 | NB | Begin: Woodbridge Road End: Acampo Road Restriction: #2 of 2 lanes Reason: Bridge Work |
10 mins |
99 | SJ | 33.6 | 33.6 | 9:01 | 14:01 | NB | Begin: Acampo Road End: Acampo Road Restriction: Full off-ramp closure Reason: Bridge Work |
10 mins |
104 | AMA | 9.3 | 9.8 | 8:01 | 16:01 | EB/WB | Begin: Ampine Road Business Park Drive End: Prospect Drive Restriction: Full highway closure Reason: Utility Work |
15 mins |
108 | STA | 27 | 26.7 | 20:01 | 6:01 | WB | Begin: Modest Irrigation District Canal End: Hetch Hetchy Bridge Restriction: #2 of 2 lanes, right shoulder Reason: Utility Work |
10 mins |
108 | STA | 27.6 | 27.1 | 7:01 | 23:01 | WB | Begin: State Route 219 End: Bangs Avenue Restriction: Long-term right shoulder Reason: Curb/Gutter/Sidewalk Work |
5 mins |
108 | TUO | 0 | 2.8 | 20:01 | 5:59 | EB/WB | Begin: State Route 120/Yosemite Junction End: State Route 49/108 Junction Restriction: Moving closure – #1 of 2 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | STA | 11.2 | 18.2 | 20:01 | 5:59 | EB/WB | Begin: Lancaster Road End: Stanislaus/Tuolumne County Line Restriction: Moving closure – #1 of 2 lanes Reason: Striping Operation |
10 mins |
120 | STA | 11.2 | 18.2 | 20:01 | 5:59 | EB/WB | Begin: Lancaster Road End: Stanislaus/Tuolumne County Line Restriction: One-way traffic control Reason: Drainage Work |
10 mins |
120 | TUO | 0 | 6.8 | 20:01 | 5:59 | EB/WB | Begin: Stanislaus/Tuolumne County Line End: Green Springs Road Restriction: Moving closure – #1,#2 of 2 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 0 | 6.8 | 8:01 | 15:59 | EB | Begin: Stanislaus/Tuolumne County Line End: Green Springs Road Restriction: Moving closure – #1, #2 of 2 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 0 | 6.8 | 16:01 | 7:59 | EB | Begin: Stanislaus/Tuolumne County Line End: Green Springs Road Restriction: Moving closure – #1 of 2 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 6.8 | 15.5 | 20:01 | 5:59 | EB/WB | Begin: Green Springs Road End: NB State Route 49/Montezuma Road Restriction: Moving closure – #1 of 2 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 6.8 | 15.5 | 20:01 | 5:59 | EB/WB | Begin: Green Springs Road End: NB State Route 49/Montezuma Road Restriction: One-way traffic control Reason: Drainage Work |
10 mins |
120 | TUO | 15.5 | 24.1 | 16:01 | 7:59 | EB/WB | Begin: NB State Route 49/Montezuma Road End: Moccasin Creek Bridge Restriction: Moving closure – #1 of 4 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 15.5 | 24.1 | 8:01 | 15:59 | EB/WB | Begin: NB State Route 49/Montezuma Road End: Moccasin Creek Bridge Restriction: Moving closure – #1 of 4 lanes, right shoulder Reason: Striping Operation |
10 mins |
120 | TUO | 15.5 | 24.1 | 16:01 | 7:59 | EB/WB | Begin: NB State Route 49/Montezuma Road End: Moccasin Creek Bridge Restriction: Moving closure – #1 of 4 lanes, right shoulder Reason: Striping Operation |
10 mins |
132 | SJ | 0.2 | 4.3 | 4:01 | 20:01 | WB | Begin: Chrisman Road End: Koster Road Restriction: Long-term #1 of 2 lanes, left shoulder, median Reason: Highway Construction |
10 mins |
132 | SJ | 0.2 | 4.3 | 6:01 | 14:01 | EB | Begin: Chrisman Road End: Koster Road Restriction: #1 of 2 lanes, median, left shoulder Reason: Highway Construction |
10 mins |
132 | SJ | 4.3 | 0.2 | 8:01 | 15:01 | WB | Begin: Koster Road End: Chrisman Road Restriction: #1 of 2 lanes, left shoulder, median Reason: Highway Construction |
10 mins |
140 | MER MPA |
35.8 | 12.1 | 9:30 | 16:01 | EB/WB | Begin: SB State Route 99 End: Beg Passing Lane (east of Catheys Valley Park) Restriction: Moving closure – #1 of 2 lanes Reason: Striping Operation |
10 mins |
152 | MER | 22.3 | 0 | 9:01 | 16:30 | EB/WB | Begin: Ward Road End: Santa Clara/Merced County Line Restriction: Moving closure – #1 of 2 lanes Reason: Pavement Marker Replacement |
10 mins |
165 | MER | 22.3 | 22.3 | 7:30 | 16:30 | NB/SB | Begin: Salt Slough Bridge End: Salt Slough Bridge Restriction: One-way traffic control Reason: AC Paving |
10 mins |
165 | MER | 25.6 | 26.4 | 7:30 | 17:30 | NB/SB | Begin: San Joaquin River Bridge End: 6th Avenue Restriction: One-way traffic control Reason: AC Paving |
10 mins |
580 | ALA | 1.037 | 0.074 | 20:01 | 12:01 | EB | Begin: Midway Road End: Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works |
10 mins |
580 | ALA | 1.037 | 0.074 | 20:01 | 4:01 | WB | Begin: Midway Road End: Greenville Road Restriction: #1, #2, #3 of 4 lanes lanes Reason: Pavement Works |
10 mins |