Angels Camp, CA…The latest schedule of road repairs and maintenance that will affect your travels in our area and as you travel. Locally crews will be working on many of our roadways. Below is Caltrans plans for repairs and maintenance on local roads. It shows the route, county and location of the possible repairs. Weather and other factors can alter their schedule.

Rte County Date
From
Date
To
Time
In
Time
Out
Dir Location /
Additional Information
Estimated
Delay
49 TUO
MPA
03/22/18 05/01/18 13:15 18:01 NB/SB Begin: Moccasin Creek
End: Bear Valley Road
Restriction: Full highway closure (Long Term)
Reason: Roadway wash-out/slip-out
1hr
49 TUO 03/28/18 03/30/18 8:30 15:30 NB/SB Begin: State Route 120, North/Chinese Camp
End: New Melones Reservoir
Restriction: Moving closure – #2, #1 of 2 lanes, right turn lane, left turn lane, two-way left turn lane, right shoulder
Reason: Sweeping Operation
10 mins
59 MER 03/22/18 05/01/18 23:01 17:01 NB/SB Begin: Reilly Road
End: Sandy Mush Road
Restriction: Long-term full highway closure
Reason: Roadway wash-out/slip-out
15 mins
99 SJ 03/28/18 03/28/18 8:30 16:01 NB Begin: State Route 120/Yosemite Avenue
End: Arch Road Under-Crossing
Restriction: Intermittent #4 of 3 lanes, right shoulder, auxiliary lane
Reason: Sweeping Operation
10 mins
108 STA 03/27/18 03/30/18 8:30 15:01 EB/WB Begin: Adams/Snedigar Road
End: Willowood Drive
Restriction: #2, #1 of 2 lanes, median, right shoulder (alternately)
Reason: Crack Seal Operation
10 mins
108 TUO 03/27/18 03/28/18 8:30 15:30 EB/WB Begin: State Route 120 Yosemite Junction
End: Hidden Acres Road
Restriction: Moving closure – #1, #2 of 2 lanes, left turn lane, left shoulder, right turn lane, two-way left turn lane, right shoulder
Reason: Sweeping Operation
10 mins
132 MPA 03/22/18 05/01/18 13:30 18:01 EB/WB Begin: Granite Springs Road
End: Piney Creek Road
Restriction: Full highway closure(Long term)
Reason: Roadway wash-out/slip-out
15 mins
132 STA 03/26/18 05/01/18 8:01 14:01 EB/WB Begin: Lake Road
End: South Old La Grange Road
Restriction: One-way traffic control
Reason: Roadway wash-out/slip-out
10 mins
132 TUO
MPA
03/27/18 03/30/18 7:30 21:01 EB/WB Begin: Bonds Flat Road
End: Granite Springs Road
Restriction: One-way traffic control
Reason: Roadway wash-out/slip-out
10 mins
140 MPA 03/26/18 05/01/18 8:15 18:01 EB/WB Begin: Miles Creek Bridge
End: Miles Creek Bridge
Restriction: One-way traffic control
Reason: Roadway wash-out/slip-out
10 mins
140 MPA 03/26/18 05/01/18 8:45 18:30 EB/WB Begin: Miles Creek Bridge
End: Miles Creek Bridge
Restriction: One-way traffic control
Reason: Roadway wash-out/slip-out
10 mins
165 MER 03/28/18 03/28/18 7:01 15:30 NB Begin: Overlan Drive
End: Overlan Drive
Restriction: Right shoulder
Reason: Shoulder Work
5 mins
Rte County Begin
PM
End
PM
Time
In
Time
Out
Dir Location /
Additional Information
Estimated
Delay
4 CAL 2.9 4.8 9:01 15:01 EB/WB Begin: Shirley Road
End: McCarty Creek
Restriction: Right shoulder, left shoulder
Reason: Guardrail Repair
10 mins
4 SJ 14.6 19.4 8:30 15:01 WB Begin: Navy Drive/Crosstown Freeway
End: State Route 99/Crosstown Freeway
Restriction: Intermittent #3 of 3 lanes, right shoulder
Reason: Sweeping Operation
10 mins
4 SJ 15.8 15.8 21:01 5:01 EB/WB Begin: Navy Drive
End: Navy Drive
Restriction: #2 of 2 lanes, right shoulder
Reason: Traffic Signal Work
10 mins
4 SJ 15.8 15.8 6:01 17:01 EB/WB Begin: Navy Drive
End: Navy Drive
Restriction: Right shoulder, left shoulder
Reason: Traffic Signal Work
5 mins
4 SJ 18.8 14.7 8:30 15:01 EB Begin: Filbert Street
End: Tillie Lewis Road
Restriction: Intermittent #3 of 3 lanes, right shoulder
Reason: Sweeping Operation
10 mins
5 SJ 25.2 25.2 22:01 5:01 NB Begin: Charter Way
End: Charter Way
Restriction: Partial off- and on-ramp closure (#1 of 2 lanes, right shoulder)
Reason: Traffic Signal Work
10 mins
5 SJ 16.5 35.3 9:01 14:01 NB/SB Begin: Louise Avenue
End: Eight Mile Road
Restriction: Right shoulder
Reason: Core Drilling
5 mins
12 SJ 17.1 17.7 6:01 19:01 EB/WB Begin: School Street
End: Central Avenue
Restriction: Bike lane, left shoulder, right shoulder, sidewalk
Reason: Curb/Gutter/Sidewalk Work
5 mins
49 AMA 4.2 4.9 18:01 6:01 NB/SB Begin: North Fork Jackson Creek
End: Beacon Gas Station
Restriction: #2, #1 of 4 lanes
Reason: Drainage Work
10 mins
49 CAL 8.1 8.3 7:01 21:01 NB/SB Begin: Stanislaus Avenue
End: Murphys Grade Road
Restriction: Intermittent one-way traffic control
Reason: K-rail Installation
10 mins
49 CAL 8.3 8.7 7:01 18:01 NB Begin: Murphys Grade Road
End: NB State Route 4
Restriction: Right shoulder
Reason: Utility Work
5 mins
49 CAL 19.4 19.5 8:01 17:01 NB/SB Begin: Gatewood Street
End: Adam Street (Left)
Restriction: Intermittent one-way traffic control
Reason: Pavement Repair
10 mins
49 MPA 30.7 34.8 8:01 14:01 NB/SB Begin: Vista Point
End: Bagby Vista Point
Restriction: Left shoulder, right shoulder
Reason: Sign Work
5 mins
49 MPA 34 34 7:01 17:01 NB/SB Begin: Merced River Bridge
End: Merced River Bridge
Restriction: One-way traffic control
Reason: Shoulder Work
10 mins
49 TUO 0 3 8:01 14:01 NB/SB Begin: Cattle Guard Road
End: Jackass Gulch Bridge
Restriction: Left shoulder, right turn lane
Reason: Drainage Work
5 mins
99 MER 7.4 11.3 7:01 15:30 SB Begin: Legrand Road
End: Healy Road
Restriction: #3 of 3 lanes
Reason: Crack Seal Operation
10 mins
99 MER 21.6 23.5 9:01 15:01 NB Begin: East Atwater Overhead
End: West Atwater Overhead
Restriction: Right shoulder
Reason: Tree Work
5 mins
99 MER
STA
35.9 0.2 21:01 5:59 NB/SB Begin: Bradbury Road
End: Turlock Rest Area
Restriction: #3, #2, #1 of 3 lanes, right shoulder, left shoulder
Reason: K-Rrail and Striping Operations
10 mins
99 SJ 13.5 15 20:01 6:01 NB Begin: Frontage Road East
End: Arch Road
Restriction: #3 of 3 lanes
Reason: Highway Construction
10 mins
99 SJ 14.6 14.6 21:01 5:01 NB/SB Begin: Arch Road
End: Arch Road
Restriction: Full off- and on-ramp closures
Reason: ITS/Various Electrical Works
10 mins
99 SJ 15 14 20:01 6:01 SB Begin: Arch Road
End: Frontage Road East
Restriction: #3 of 3 lanes
Reason: Highway Construction
10 mins
99 SJ 18.5 22.9 20:01 6:01 NB/SB Begin: Marsh Street Pedestrian Overcrossing (South of Remont Street)
End: Hammer Lane Over-Crossing
Restriction: #3, #4, #1, #2 of 4 lanes (alternately)
Reason: Pavement Work
10 mins
99 SJ 32.6 33.6 9:01 14:01 NB Begin: Woodbridge Road
End: Acampo Road
Restriction: #2 of 2 lanes
Reason: Bridge Work
10 mins
99 SJ 33.6 33.6 9:01 14:01 NB Begin: Acampo Road
End: Acampo Road
Restriction: Full off-ramp closure
Reason: Bridge Work
10 mins
104 AMA 9.3 9.8 8:01 16:01 EB/WB Begin: Ampine Road Business Park Drive
End: Prospect Drive
Restriction: Full highway closure
Reason: Utility Work
15 mins
108 STA 27 26.7 20:01 6:01 WB Begin: Modest Irrigation District Canal
End: Hetch Hetchy Bridge
Restriction: #2 of 2 lanes, right shoulder
Reason: Utility Work
10 mins
108 STA 27.6 27.1 7:01 23:01 WB Begin: State Route 219
End: Bangs Avenue
Restriction: Long-term right shoulder
Reason: Curb/Gutter/Sidewalk Work
5 mins
108 TUO 0 2.8 20:01 5:59 EB/WB Begin: State Route 120/Yosemite Junction
End: State Route 49/108 Junction
Restriction: Moving closure – #1 of 2 lanes, right shoulder
Reason: Striping Operation
10 mins
120 STA 11.2 18.2 20:01 5:59 EB/WB Begin: Lancaster Road
End: Stanislaus/Tuolumne County Line
Restriction: Moving closure – #1 of 2 lanes
Reason: Striping Operation
10 mins
120 STA 11.2 18.2 20:01 5:59 EB/WB Begin: Lancaster Road
End: Stanislaus/Tuolumne County Line
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
120 TUO 0 6.8 20:01 5:59 EB/WB Begin: Stanislaus/Tuolumne County Line
End: Green Springs Road
Restriction: Moving closure – #1,#2 of 2 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 0 6.8 8:01 15:59 EB Begin: Stanislaus/Tuolumne County Line
End: Green Springs Road
Restriction: Moving closure – #1, #2 of 2 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 0 6.8 16:01 7:59 EB Begin: Stanislaus/Tuolumne County Line
End: Green Springs Road
Restriction: Moving closure – #1 of 2 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 6.8 15.5 20:01 5:59 EB/WB Begin: Green Springs Road
End: NB State Route 49/Montezuma Road
Restriction: Moving closure – #1 of 2 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 6.8 15.5 20:01 5:59 EB/WB Begin: Green Springs Road
End: NB State Route 49/Montezuma Road
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
120 TUO 15.5 24.1 16:01 7:59 EB/WB Begin: NB State Route 49/Montezuma Road
End: Moccasin Creek Bridge
Restriction: Moving closure – #1 of 4 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 15.5 24.1 8:01 15:59 EB/WB Begin: NB State Route 49/Montezuma Road
End: Moccasin Creek Bridge
Restriction: Moving closure – #1 of 4 lanes, right shoulder
Reason: Striping Operation
10 mins
120 TUO 15.5 24.1 16:01 7:59 EB/WB Begin: NB State Route 49/Montezuma Road
End: Moccasin Creek Bridge
Restriction: Moving closure – #1 of 4 lanes, right shoulder
Reason: Striping Operation
10 mins
132 SJ 0.2 4.3 4:01 20:01 WB Begin: Chrisman Road
End: Koster Road
Restriction: Long-term #1 of 2 lanes, left shoulder, median
Reason: Highway Construction
10 mins
132 SJ 0.2 4.3 6:01 14:01 EB Begin: Chrisman Road
End: Koster Road
Restriction: #1 of 2 lanes, median, left shoulder
Reason: Highway Construction
10 mins
132 SJ 4.3 0.2 8:01 15:01 WB Begin: Koster Road
End: Chrisman Road
Restriction: #1 of 2 lanes, left shoulder, median
Reason: Highway Construction
10 mins
140 MER
MPA
35.8 12.1 9:30 16:01 EB/WB Begin: SB State Route 99
End: Beg Passing Lane (east of Catheys Valley Park)
Restriction: Moving closure – #1 of 2 lanes
Reason: Striping Operation
10 mins
152 MER 22.3 0 9:01 16:30 EB/WB Begin: Ward Road
End: Santa Clara/Merced County Line
Restriction: Moving closure – #1 of 2 lanes
Reason: Pavement Marker Replacement
10 mins
165 MER 22.3 22.3 7:30 16:30 NB/SB Begin: Salt Slough Bridge
End: Salt Slough Bridge
Restriction: One-way traffic control
Reason: AC Paving
10 mins
165 MER 25.6 26.4 7:30 17:30 NB/SB Begin: San Joaquin River Bridge
End: 6th Avenue
Restriction: One-way traffic control
Reason: AC Paving
10 mins
580 ALA 1.037 0.074 20:01 12:01 EB Begin: Midway Road
End: Greenville Road
Restriction: #1, #2, #3 of 4 lanes lanes
Reason: Pavement Works
10 mins
580 ALA 1.037 0.074 20:01 4:01 WB Begin: Midway Road
End: Greenville Road
Restriction: #1, #2, #3 of 4 lanes lanes
Reason: Pavement Works
10 mins