Weekly Caltrans Road Repair & Maintenance Schedule. Repair Volume Close To Peak

Stockton, CA…Caltrans Distric 10 has just released their latest work and repair schedule for our area. We are reaching the peak of summer repairs and maintenance. Expect delays out there. The table below shows road, location and expected delays.

06.23.14 Poster Contest

Rte County Begin
PM
End
PM
Date
From
Date
To
Time
In
Time
Out
Dir Location /
Additional Information
Estimated
Delay
4 ALP 18.6 31.7 08/24/15 08/27/15 8:30 16:01 EB/WB Begin: Ebbetts Pass
End: Alpine/El Dorado County Line
Restriction: One-way traffic control
Reason: Drainage Cleaning
5 mins
4 CAL 14.7 15.8 08/24/15 08/28/15 6:01 17:59 EB/WB Begin: Poole Station Road
End: Appaloosa Road
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
4 CAL 37.6 38.9 08/24/15 08/28/15 6:01 17:59 EB/WB Begin: Avery Hotel Road
End: Rancho Paradiso
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
4 CAL 63.9 64.8 08/24/15 08/28/15 6:01 17:59 EB/WB Begin: Salt Springs Trail
End: Sherman Acres
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
4 SJ 4.4 8.7 08/25/15 08/27/15 8:30 14:30 EB/WB Begin: Middle River Bridge
End: Whisky Slough
Restriction: One-way traffic control
Reason: AC Paving
10 mins
4 SJ 15.3 15.3 08/24/15 08/28/15 17:01 3:01 EB Begin: Fresno Avenue/Crosstown Freeway
End: Fresno Avenue/Crosstown Freeway
Restriction: Partial off-ramp closure (#1 of 2 lanes)
Reason: Striping Operation
5 mins
4 SJ 16 16 08/24/15 08/29/15 9:01 14:30 EB Begin: Interstate 5/Crosstown Freeway
End: Interstate 5/Crosstown Freeway
Restriction: #2 of 2 lanes of connector ramp
Reason: Bridge Work
5 mins
4 SJ 19.4 19.4 08/23/15 08/28/15 0:01 3:01 SB Begin: State Route 99/Crosstown Freeway
End: State Route 99/Crosstown Freeway
Restriction: Full connector ramp closures
Reason: Highway Construction
10 mins
4 SJ 19.8 20.2 08/23/15 08/28/15 22:01 5:01 EB/WB Begin: Farmington Road
End: Farmington Road
Restriction: One-way traffic control
Reason: Roadway Excavation
10 mins
4 STA 4.5 6.3 08/24/15 08/28/15 6:01 17:59 EB/WB Begin: Milton Road
End: Rockaway Creek
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
5 MER 32.1 32.5 08/24/15 08/28/15 7:01 16:01 NB/SB Begin: Garzas Creek Bridge
End: Merced/Stanislaus County Line
Restriction: Right shoulder, left shoulder
Reason: Shoulder Work
None
5 MER 32.5 32.5 08/23/15 08/28/15 20:01 5:01 NB/SB Begin: State Route 140
End: State Route 140
Restriction: Full off and on-ramp closures
Reason: Pavement Repair
10 mins
5 MER 32.5 32.5 08/23/15 08/28/15 20:01 7:01 NB/SB Begin: State Route 140 (Merced/Stanislaus County Line)
End: State Route 140 (Merced/Stanislaus County Line)
Restriction: #1 of 2 lanes
Reason: Pavement Repair
10 mins
5 SJ 0 12.4 08/23/15 08/28/15 19:01 6:01 NB/SB Begin: Stanislaus/San Joaquin County Line
End: Tom Paine Slough
Restriction: #1, #2 of 2 lanes
Reason: Pavement Repair
10 mins
5 SJ 0 12.4 08/24/15 08/28/15 7:01 16:01 NB/SB Begin: Stanislaus/San Joaquin County Line
End: Tom Paine Slough
Restriction: Shoulder closure
Reason: Pavement Repair
None
5 SJ 2 2.5 08/26/15 08/28/15 20:01 6:01 NB/SB Begin: California Aqueduct
End: Blewett Road Overcrossing (South of State Route 132)
Restriction: One-way traffic control (local street)
Reason: Bridge Work
10 mins
5 SJ 25.4 28.5 08/23/15 08/28/15 21:01 6:01 NB/SB Begin: State Route 4/Charter Way Undercrossing
End: Country Club Boulevard
Restriction: #3, #2, #1 of 3 lanes (alternating)
Reason: Highway Construction
10 mins
5 SJ 26.1 26.1 08/23/15 08/28/15 22:01 6:01 NB/SB Begin: State Route 4/Crosstown Freeway
End: State Route 4/Crosstown Freeway
Restriction: Full connector ramp closures
Reason: Highway Construction
10 mins
5 SJ 28.5 28.5 08/23/15 08/28/15 21:01 6:01 NB/SB Begin:State Route 4/Charter Way
End: Country Club Boulevard
Restriction: Full off and on-ramp closures
Reason: Highway Construction
10 mins
5 SJ 29.6 29.6 08/25/15 08/25/15 8:30 17:01 NB/SB Begin: Plymouth Oaks Court
End: Calaveras River
Restriction: Moving closure – left shoulder, median, right shoulder
Reason: Utility Work
5 mins
5 SJ 39.6 39.6 08/23/15 08/28/15 20:01 5:01 NB/SB Begin: State Route 12
End: State Route 12
Restriction: Intermittent full on-ramp closure, #1 of 3 lanes, #3 of 3 lanes
Reason: Shoulder Work
20 mins
5 STA 0 28.1 08/23/15 08/28/15 20:01 5:01 NB Begin: Stanislaus/Merced County Line
End: Stanislaus/San Joaquin County Line
Restriction: #1, #2 of 2 lanes (alternating)
Reason: Pavement Repair
15 mins
5 STA 0 28.1 08/23/15 08/28/15 19:01 6:01 SB Begin: Merced/Stanislaus County Line
End: Stanislaus/San Joaquin County Line
Restriction: #1, #2 of 2 lanes (alternating)
Reason: Pavement Repair
15 mins
5 STA 0 28.1 08/24/15 08/28/15 7:01 16:01 NB/SB Begin: Merced/Stanislaus County Line
End: Stanislaus/San Joaquin County Line
Restriction: Shoulder work
Reason: Misc work
5 mins
5 STA 3.9 3.9 08/23/15 08/28/15 19:01 6:01 SB Begin: Vista Point South
End: Vista Point South
Restriction: Full off and on-ramp closures
Reason: Pavement Repair
15 mins
5 STA 5.5 5.5 08/23/15 08/28/15 19:01 6:01 SB Begin: Stuhr Road
End: Stuhr Road
Restriction: Full off and on-ramp closures
Reason: ITS/Various Electrical Works
15 mins
5 STA 5.5 5.5 08/23/15 08/28/15 20:01 5:01 NB Begin: Stuhr Road
End: Stuhr Road
Restriction: Full off and on-ramp closure
Reason: ITS/Various Electrical Works
15 mins
5 STA 12.9 12.9 08/23/15 08/28/15 20:01 5:01 NB Begin: Vista Point North
End: Vista Point North
Restriction: Full off- and on-ramp closures Reason: ITS/Various Electrical Works
15 mins
12 CAL 9.7 10.2 06/22/15 10/09/15 0:01 23:59 EB/WB Begin: Pine Street
End: Cosgrove Creek
Restriction: Long-term right shoulder
Reason: Highway Construction
None
12 CAL 9.8 10.3 08/25/15 08/28/15 19:01 5:01 EB/WB Begin: Pine Street
End: Cosgrove Creek
Restriction: One-way traffic control
Reason: Pavement Marker Replacement
5 mins
12 SJ 4.4 10.8 08/23/15 08/28/15 20:01 5:01 EB/WB Begin: Potato Slough
End: Flag City Boulevard
Restriction: One-way traffic control
Reason: Shoulder Work
20 mins
26 AMA 4 4.6 08/24/15 08/28/15 6:01 16:59 EB/WB Begin: Rocky Lane
End: State Route 88
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
26 CAL 9.9 10.3 08/25/15 08/28/15 19:01 5:01 EB/WB Begin: Hogan Dam Road
End: West State Route 12
Restriction: One-way traffic control
Reason: Pavement Marker Replacement
5 mins
26 CAL 10 10.5 06/22/15 10/09/15 0:01 23:59 EB/WB Begin: Nove Way
End: State Route 12
Restriction: Long-term #1 of 2 lanes, right shoulder
Reason: Highway Construction
None
33 MER 3.9 4.4 08/24/15 08/26/15 6:01 18:01 NB/SB Begin: Cypress Road
End: Poso Slough Bridge (Near Linden Avenue)
Restriction: One-way traffic control
Reason: Bridge Work
15 mins
33 SJ 4.9 5 08/28/15 08/28/15 10:01 13:01 NB/SB Begin: Interstate 5
End: Interstate 5
Restriction: One-way traffic control
Reason: Accident Investigations
5 mins
49 TUO 18.3 18.2 08/24/15 08/24/15 7:01 15:01 SB Begin: Snell Road
End: Dodge Street
Restriction: Right shoulder
Reason: Utility Work
5 mins
49 TUO 23.7 24.5 08/24/15 08/24/15 8:01 15:01 NB/SB Begin: Rawhide Road
End: Sapphire Ridge Road
Restriction: One-way traffic control
Reason: Pavement Repair
15 mins
59 MER 15 15.2 08/25/15 08/26/15 20:30 6:30 NB/SB Begin: 16th Street
End: Bear Creek Bridge (Before Big Creek Drive)
Restriction: #1 of 2 lanes
Reason: Grinding and Paving
5 mins
59 MER 23 33.7 08/24/15 08/28/15 6:01 18:01 NB/SB Begin: Oakdale Road
End: La Grange Road
Restriction: One-way traffic control
Reason: Miscellaneous Work
10 mins
59 MER 24.1 26.1 08/24/15 08/26/15 6:01 18:01 NB/SB Begin: Edendale Creek Bridge (past Nevada Street)
End: Escaladian Canal Bridge
Restriction: One-way traffic control
Reason: Bridge Work
15 mins
88 ALP 0 7.8 08/24/15 08/28/15 6:01 20:01 EB/WB Begin: State Route 88
End: Begin Passing Lane (East of Red Lake Road)
Restriction: One-way traffic control
Reason: Paving Operation
20 mins
88 ALP 7.4 25.3 08/26/15 08/28/15 6:01 20:01 EB/WB Begin: Red Lake Road
End: California/Nevada State Line
Restriction: One-way traffic control
Reason: Paving Operation
20 mins
88 ALP 7.8 16.1 08/24/15 08/27/15 8:30 16:01 WB Begin: East of Red Lake Road
End: West Fork Carson River Bridge
Restriction: One-way traffic control
Reason: Shoulder Work
10 mins
88 AMA 30.5 31.9 08/24/15 08/28/15 6:01 16:59 EB/WB Begin: Buckhorn Ridge Road
End: Meadow Vista Drive
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
88 AMA 54.3 62.8 08/26/15 08/28/15 6:01 20:01 EB/WB Begin: Peddler Hill Road
End: Tragedy Springs Road
Restriction: One-way traffic control
Reason: Paving Operation
20 mins
88 AMA 66.7 71.6 08/26/15 08/28/15 6:01 20:01 EB/WB Begin: Silver Lake Campground
End: Amador/Alpine County Line
Restriction: One-way traffic control
Reason: Paving Operation
20 mins
89 ALP 0 14.8 08/24/15 08/27/15 8:30 16:01 NB/SB Begin: Alpine/Mono County Line
End: Montgomery Street
Restriction: One-way traffic control
Reason: Drainage Work
10 mins
89 ALP 14.1 14.9 08/24/15 08/28/15 7:01 17:01 NB/SB Begin: Markleeville Campground Road
End: Webster Street
Restriction: One-way traffic control
Reason: Pavement Work
15 mins
99 MER 14.1 14.1 01/21/15 12/31/15 0:01 23:59 SB Begin: East State Route 140
End: East State Route 140
Restriction: Long-term full off-ramp closure
Reason: Highway Construction
5 mins
99 MER 14.4 14.4 01/21/15 12/31/15 0:01 23:59 SB Begin: G Street
End: G Street
Restriction: Long-term full on-ramp closure
Reason: Highway Construction
5 mins
99 MER 20.4 20.4 10/07/14 12/31/15 0:01 23:59 SB Begin: Buhach Road
End: Buhach Road
Restriction: Long-term full off and on-ramp closures
Reason: Highway Construction
10 mins
99 SJ 4.9 4.9 08/23/15 08/28/15 21:01 5:01 NB/SB Begin: Austin Road
End: Austin Road
Restriction: Full on-ramp closure
Reason: Miscellaneous Work
10 mins
99 SJ 4.9 4.9 08/23/15 08/28/15 7:01 16:01 NB/SB Begin: Austin Road
End: Austin Road
Restriction: Partial on-ramp closure (right shoulder, left shoulder)
Reason: Shoulder Work
None
99 SJ 6.7 11.5 08/23/15 08/28/15 20:01 5:01 NB Begin: State Route 120/Yosemite Avenue
End: French Camp
Restriction: #1, #3 of 3 lanes
Reason: Shoulder Work
5 mins
99 SJ 9.2 9.2 08/23/15 08/28/15 21:01 5:01 NB/SB Begin: Lathrop Road
End: Lathrop Road
Restriction: Full on-ramp closure
Reason: Shoulder Work
5 mins
99 SJ 11.5 6.7 08/23/15 08/28/15 21:01 5:01 SB Begin: French Camp
End: State Route 120/Yosemite Avenue
Restriction: #1, #3 of 3 lanes
Reason: Shoulder Work
5 mins
99 SJ 12.7 16.7 08/24/15 08/28/15 7:01 17:01 N/A Begin: Mariposa Road
End: Mariposa Road
Restriction: #2, #1 of 2 lanes (alternating; local street)
Reason: Miscellaneous Work
10 mins
99 SJ 14.6 14.6 08/23/15 08/28/15 20:01 5:01 NB Begin: Arch Road
End: Arch Road
Restriction: #1, #3 of 3 lanes
Reason: Shoulder Work
5 mins
99 SJ 14.6 9.2 08/23/15 08/28/15 21:01 5:01 SB Begin: Arch Road
End: Lathrop Road
Restriction: #1, #3 of 3 lanes
Reason: Shoulder Work
5 mins
99 SJ 14.6 18.7 08/23/15 08/28/15 21:01 5:01 NB Begin: Arch Road
End: State Route 4/Crosstown Freeway
Restriction: #1, #2 of 2 lanes (alternating)
Reason: Highway Construction
10 mins
99 SJ 12.7 16.7 08/23/15 08/28/15 7:01 5:01 N/A Begin: West Frontage Road
End: West Frontage Road
Restriction: One-way traffic control (local street)
Reason: Graffiti Removal
10 mins
99 SJ 14.6 16.7 08/23/15 08/28/15 7:01 17:01 N/A Begin: East Frontage Road
End: East Frontage Road
Restriction: One-way traffic control (local street)
Reason: Graffiti Removal
10 mins
99 SJ 16.7 16.7 08/23/15 08/28/15 22:01 5:01 SB Begin: Mariposa Road
End: Mariposa Road
Restriction: Full off-ramp closure
Reason: Highway Construction
10 mins
99 SJ 17.2 17.2 08/23/15 08/28/15 0:01 23:59 SB Begin: East State Route 4/Farmington
End: East State Route 4/Farmington
Restriction: Long-term full off-ramp closure
Reason: Highway Construction
10 mins
99 SJ 17.2 17.2 08/23/15 08/28/15 21:01 5:01 NB Begin: East State Route 4/Farmington
End: East State Route 4/Farmington
Restriction: Full off-ramp closure
Reason: Highway Construction
10 mins
99 SJ 17.2 17.2 08/23/15 08/28/15 21:01 5:01 NB Begin: Peterson Detour/Mariposa Temporary On-Ramp
End: Peterson Detour/Mariposa Temporary On-Ramp
Restriction: Full on-ramp closure
Reason: Highway Construction
10 mins
99 SJ 17.4 17.4 08/23/15 08/28/15 21:01 5:01 NB Begin: Golden Gate Avenue
End: Golden Gate Avenue
Restriction: Full off and on-ramp closure
Reason: Highway Construction
10 mins
99 SJ 17.8 18.1 08/24/15 08/29/15 22:01 5:01 NB/SB Begin: Golden Gate Avenue
End: Main Street
Restriction: #1, #2 of 2 lanes
Reason: Highway Construction
10 mins
99 SJ 18.7 14.6 08/23/15 08/28/15 22:01 5:01 SB Begin: State Route 4/Crosstown Freeway
End: Arch Road
Restriction: #2, #1 of 2 lanes (alternating)
Reason: Highway Construction
10 mins
99 SJ 18.1 18.1 08/23/15 08/23/15 6:30 7:01 NB/SB Begin: Main Street
End: Main Street
Restriction: Full highway closure (Traffic Break)
Reason: Utility Work Aerial Crossing
10 mins
99 SJ 21.8 21.9 08/26/15 08/28/15 19:01 6:01 NB Begin: Calaveras River Overcrossing
End: Calaveras River Overcrossing
Restriction: #3, #1, #4, #2 of 4 lanes (alternating)
Reason: Bridge Work
10 mins
99 SJ 22.9 29 08/23/15 08/28/15 19:01 6:01 NB/SB Begin: Hammer Lane
End: South Lodi Overcrossing (North of Kettleman Lane)
Restriction: #2, #3, #1 of 3 lanes (alternating)
Reason: Paving Operation
10 mins
99 SJ 22.9 29 08/23/15 08/28/15 19:01 6:01 NB/SB Begin: Hammer Lane
End: San Joaquin/Sacramento County Line
Restriction: Various full off and on-ramps
Reason: Miscellaneous Work
10 mins
99 SJ 29 38.8 08/23/15 08/28/15 21:00 6:01 SB Begin: South Lodi Overcrossing
End: San Joaquin/Sacramento County Line
Restriction: #1, #2 of 2 lanes (alternating)
Reason: Miscellaneous Work
10 mins
99 STA 0 24.8 08/24/15 08/28/15 20:01 4:30 NB/SB Begin: Stanislaus/Merced County Line
End: Stanislaus/San Joaquin County Line
Restriction: Moving closure – #1 of 3 lanes
Reason: Pavement Repair
5 mins
99 STA 22.6 22.6 08/24/15 08/28/15 20:01 6:01 NB/SB Begin: Broadway Avenue/State Route 219
End: Broadway Avenue/State Route 219
Restriction: Full off and on-ramp closure
Reason: Striping Operation
10 mins
108 STA 23.4 23.4 08/28/15 08/28/15 1:01 5:01 EB Begin: Modesto Avenue
End: Morris Avenue
Restriction: #2 of 2 lanes
Reason: Utility Work
5 mins
108 STA 26.5 26.8 08/26/15 08/28/15 20:01 5:01 EB Begin: Coralwood Road
End: Claratina Avenue
Restriction: #2 of 2 lanes
Reason: Traffic Signal Work
5 mins
108 TUO 7.5 9.6 08/24/15 08/27/15 6:01 18:59 EB Begin: Soulsbyville Road
End: County Dump Road
Restriction: #1 of 2 lanes
Reason: Fence Work
5 mins
108 TUO 7.5 9.6 08/28/15 08/28/15 6:01 14:59 EB Begin: Soulsbyville Road
End: County Dump Road
Restriction: #1 of 2 lanes
Reason: Fence Work
5 mins
108 TUO 7.9 7.5 08/23/15 08/24/15 21:01 5:01 WB Begin: 3,000-foot Elevation Marker (East of Soulsbyville Road)
End: Soulsbyville Road
Restriction: #1 of 2 lanes
Reason: Traffic Signal Work
None
108 TUO 7.9 7.5 08/24/15 08/27/15 6:01 17:01 WB Begin: 3,000-foot Elevation Marker (East of Soulsbyville Road)
End: Soulsbyville Road
Restriction: #1 of 2 lanes
Reason: Traffic Signal Work
5 mins
108 TUO 7.9 7.5 08/28/15 08/28/15 6:01 14:01 WB Begin: 3,000-foot Elevation Marker (East of Soulsbyville Road)
End: Soulsbyville Road
Restriction: #1 of 2 lanes
Reason: Traffic Signal Work
5 mins
108 TUO 40.4 43.5 08/25/15 08/28/15 8:30 14:30 EB/WB Begin: Cascade Creek Road
End: Special Service Road
Restriction: #1 lane
Reason: Shoulder Work
5 mins
120 TUO 53 56.5 08/24/15 08/28/15 6:01 16:59 EB/WB Begin: South Fork Tuolumne Bridge
End: West Boundary Yosemite Park
Restriction: #1 lane
Reason: Drainage Work
10 mins
120 TUO 55.6 56.2 08/24/15 08/28/15 7:01 17:01 EB Begin: Hardin Flat Road
End: Evergreen Road
Restriction: One-way traffic control
Reason: Roadway Excavation
10 mins
124 AMA 0.8 1 08/24/15 08/28/15 7:01 17:01 EB/WB Begin: Buena Vista Road
End: East of Buena Vista Road
Restriction: One-way traffic control
Reason: Utility Work
5 mins
124 AMA 2.3 10.3 08/24/15 08/28/15 6:01 18:01 EB/WB Begin: East State Route 104
End: State Route 16
Restriction: One-way traffic control
Reason: Paving Operation
10 mins
132 TUO 4.02 5.96 08/24/15 08/28/15 6:30 14:01 EB/WB Begin: Bonds Flat Road
End: Las Palmas Way
Restriction: One-way traffic control
Reason: Maintenance Operation
5 mins
132 STA 15.1 15.1 07/13/15 10/16/15 6:01 23:59 WB Begin: 11th Street/D Street
End: 11th Street/D Street
Restriction: Long-term Left Turn Lane
Reason: Traffic Signal Work
5 mins
132 STA 15.9 16 08/26/15 08/27/15 9:01 15:01 EB Begin: Santa Rosa Avenue
End: Wilson Avenue/Santa Rita Avenue
Restriction: #2 of 2 lanes
Reason: Miscellaneous Work
5 mins
132 STA 16 16.2 08/24/15 08/25/15 19:01 5:01 EB Begin: Wilson Avenue/Santa Rita Avenue
End: Santa Barbara Avenue
Restriction: Right turn lane, left turn lane, right shoulder
Reason: Pavement Work
5 mins
140 MPA 40.5 43.2 03/30/15 12/31/15 0:01 23:59 EB/WB Begin: Savage Trading Post
End: South Fork Merced River
Restriction: Long-term left shoulder, right shoulder
Reason: Slide Removal
10 mins
165 MER 9.5 10.1 08/23/15 08/25/15 20:01 6:01 NB Begin: East B Street
End: Casa Mobile Park (Right)
Restriction: #2 of 2 lanes
Reason: AC Paving
5 mins
219 STA 0.1 1.9 08/24/15 08/28/15 9:01 14:30 WB Begin: State Route 99
End: Dale Road
Restriction: #2 of 2 lanes
Reason: Utility Work
10 mins
NOTE: Unexpected schedule changes can occur due to weather, traffic, availability of equipment and material,
and related issues. For updates on California State Highways, please visit the Caltrans Quickmap at
http://quickmap.dot.ca.gov or call 1-800-427-ROAD. The Caltrans District 10 website is at www.dot.ca.gov/dist10.